Running Programs Consecutively.
I have 4 programs an 4 zones. With my old Rainbird system I simply set the run time and all the zones ran back to back. Now it seems I need to set a start time for each program, is that correct. If not, how do I set it up to run the programs consecutively.
Thanks
-
I am looking for something similar. I have lawn program with soak cycle enabled, and would like to run drips immediately after the lawn program ends, rather than cycle through drips as well. Right now, it is not possible to kick start one program relative to the end of the other one, just relative to sunrise / sunset, but not relative to start / end of another program. That would be super handy IMHO
Please sign in to leave a comment.
Comments
1 comment