Problem with suggested watering
If I use the suggested water time, the water history log does not use the multiplier. This appears that I am using more water than if I use the custom time with the same amount of time in each case. In this case zone 2 is using the suggested water and zone 3 is using the custom, but both should be the same amount of time in the Total Scheduled column.

Please sign in to leave a comment.
Comments
0 comments